Building story

The Conversion

The former cow barn became four holiday apartments – the conversion in pictures.


Where four holiday apartments are today, there used to be cows. The barn of the Gulfhof was converted over the past years – from the new roof and brick facade to the very last paving stone. Here is a look back in pictures.

  1. May 2023

    The roof is open

    View under the uncovered roof of the barn building, secured by safety nets
  2. June 2023

    A new roof

    The scaffolding is up, roofing membrane and battens are already on the roof
    Roof tiles are lifted onto the newly battened roof by crane
    The tiles are laid, the open timber trusses are visible underneath
  3. June & July 2023

    The barn is gutted

    A mini excavator breaks up the old floor inside the barn and clears the rubble
    The crane stands in the farmyard, scaffolding is up at the main house
    The new tiled roof is mostly done, with the old cow-barn ceiling seen from above
    The barn is gutted: props carry the old ceiling, the floor is filled with sand
  4. August 2023

    The new floor slab

    The reinforcement for the new floor slab is laid out in the barn
  5. September 2023

    New walls take shape

    New partition walls on the ground floor, the old brick ceiling and steel beam above
  6. October 2023

    The outer wall is rebuilt

    The entire outer wall is removed and rebuilt, a mini excavator working inside the building
    The sign by the road: “Hier entstehen 4 Ferienwohnungen – ab Frühjahr 2024” (4 holiday apartments coming spring 2024)
  7. December 2023

    Windows, doors, screed

    The insulating fill (Thermowhite) is pumped in on the upper floor, the screed follows on top later
    The brick facade is up, windows and green doors are installed
    The finished screed in the attic floor, with the pipework sticking out
    The sand bed in front of the apartments is prepared
  8. February to May 2024

    The facade is finished

    Drainage channels and pipes at the terrace door, with the outdoor tap next to it
    Evening sun on the finished brick facade
  9. May & June 2024

    Interior fit-out

    Living area with new flooring and a floor-to-ceiling terrace door
    The bathroom is tiled, with a roof window in the background
    View from the hallway into the bathroom and the bedroom
    The kitchen is installed, the floor still covered
    The sauna cabin is already in place in the bathroom
    The first beds are in the bedroom
    The bathroom is finished: shower, washbasin and sauna cabin
  10. June & July 2024

    Garden and outdoor areas

    The yard in front of the apartments, the paved path takes shape
    The facade with paved terraces and paths
    Evening mood at the illuminated terraces
    The playground in the garden
    The lawn is being laid, the path lighting is in place
    Freshly laid lawn and privacy fences, farm dog Bosse in the foreground
    Terraces, lawn and privacy fences at the apartments
    Evening path with lanterns along the apartments
  11. July 2024

    Ready to move in

    The furnished living area with a view of the terrace
    The furnished kitchen